Magnetic Automation recently installed six MCG cantilever gates at a wastewater treatment plant to protect valuable assets.

A key objective of the installation was to prevent the entry of unauthorised vehicles into the water treatment site. The cantilever gates installed at the site have a high duty cycle to allow for continuous operation and gate speeds of up to 600mm per second for utmost efficiency.

MCG cantilever gates are ideal for worksites as they don’t require overhanging or ground tracks for installation. The gates can also be supplied in a hot dip galvanised finish for maximum protection and increased lifespan.