Landmark Products  installed one of its steel truss bridges at Toodyay, WA for the Avon River Footbridge that provides a critical pedestrian link from Toodyay District High School to Toodyay town. Over 200 children use the footbridge each day. 

Landmark Products reconstituted the old timber piers, and manufactured and installed a 170m x 3m steel superstructure with aluminium barrier panels.

The factory-built Murray steel truss pedestrian bridges offer a strong, lightweight and versatile solution where longer bridge spans are required. The K1105 steel truss bridges feature hot-dip galvanised components that are flat-packed for ease of transport, allowing for cost effective installation in remote or difficult sites.

Landmark pedestrian bridges are supplied with: 

  • Precision pre-manufactured components and all necessary hardware
  • Complete pier and abutment design (subject to geotechnical report)
  • Detailed, step-by-step installation instructions
  • Professional building application drawings
  • Engineer certification
  • 10-year structural warranty
  • Maintenance guide