Talking Architecture & Design Podcast (Episode 225) - 2024 AIA Gold Medal Winner Philip Thalis on urban density, transport design and how to fix Sydney Listen Now
My shortlist (0 item)

    EBSA

    EBSA combines natural light and ventilation with automated window systems to help create energy efficient and sustainable buildings. 

     

    News

    LAMILUX glass roof PR60 – where safety meets architectural design excellence
    We are pleased to present the LAMILUX glass roof PR60, a system that combines safety with high architectural ...
    Big win for EBSA at 2023 APAC Business Awards
    EBSA was recognised as the ‘Most Innovative Window System 2023 and Leading Provider of Architectural Glass Louvres ...
    Schneider louvre systems enable smoke control and natural ventilation at Marvel Stadium
    EBSA was involved in Melbourne's Marvel Stadium upgrade project, supplying and installing their cutting-edge ...
    EBSA’s operable glass louvres installed at Australian Retirement Trust Workplace
    EBSA supplied and installed their operable glass louvres and a smoke control interface at the prestigious Australian ...
    Passive buildings for active communities: Overhead glazing and glass louvre installations for indoor swimming pools and sports halls
    Despite being widely-used amenities, indoor swimming pools and sports halls frequently place a financial burden on ...
    Midtown Centre featuring EBSA products wins Property Council of Australia award
    The Fender Katsalidis-designed Midtown Centre has won the Property Council of Australia GHD Design Award for the ...
    How smart technology is revolutionising building automation
    By integrating digital actuators and controllers, buildings can now communicate directly with window actuators, ...
    EBSA releases new MP2 opposed opening louvre at AusFenEx23
    The Schneider MP2 louvre, initially introduced in 2012, quickly emerged as the preferred choice in the Australian ...

    Resources

    Case study: The Clifton Springs Primary School, Bellarine Peninsula, Victoria
    In planning for a new school at Clifton Springs in Victoria, Minx Architecture and Thomas Consulting where engaged to ...
    Passive buildings for active communities: Overhead glazing and glass louvre installations for indoor swimming pools and sports halls
    Despite being widely-used amenities, indoor swimming pools and sports halls frequently place a financial burden on ...
    Sustainable glass roof systems for modern shopping centres
    Australian shopping centres account for 36% of commercial building energy consumption. Due to their size and ...
    Architectural glass louvres & schools: Opportunities in the post-COVID landscape
    Many school classrooms are operating with low ventilation rates and CO2 levels beyond the recommended threshold. In ...
    Open-and-shut case: Specifying architectural glass louvres for compliance and performance
    Architectural glass louvre systems are an invaluable tool for designers and specifiers to meet ever-increasing ...
    A glass roof for Passive House: Specifying glass roof systems for thermal efficiency, natural ventilation and smoke control
    Good glass roof design delivers benefits in line with Passive House principles: exceptional insulation, ...
    Mechanical smoke extraction Brochure
    Mechanical smoke extraction Brochure
    Mechanical smoke extraction: Information for D+H service and sales partners
    Mechanical smoke extraction: Information for D+H service and sales partners
    Windows of opportunity: Specifying automatic windows for health, safety and sustainability
    As the demand for high-performing green buildings increases, window automation offers opportunities to ...
    Enhancing indoor air quality in schools with window automation
    Window automation represents one simple method of enhancing indoor air quality without relying on mechanical ...
    EBSA delivers vital fire safety features for new ‘smart’ Sydney development
    Developer Longton Property Group knew that only the latest fire safety technologies would suffice for its Avantra ...

    Contact

    brisbane head office
    Unit 4/209 Leitchs Road
    Brendale
    QLD  4500
    melbourne office
    Unit 6/8 Garden Road
    Clayton
    VIC  3168
    sydney office
    Unit 45/7-9 Production Road
    Taren Point
    NSW  2229

    Back to Top